[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:\u002Fconduit-fill-calculator":3},{"path":4,"title":5,"description":6,"h1":7,"kind":8,"updated":9,"calculator":10,"downloads":11,"sections":12,"toc":60,"stats":69,"readingMinutes":70,"related":71,"children":90,"parent":91},"\u002Fconduit-fill-calculator","Conduit Fill Calculator","Free conduit fill calculator for estimators. Add conductor areas, compare them with the allowed fill for 1, 2 or more conductors, and see how the check works.","Conduit fill calculator","calculator","2026-11-13","conduit-fill",[],[13,17,22,26,30,34,38,42,56],{"id":14,"title":15,"kind":14,"html":16},"intro","","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">This calculator has not yet been reviewed by a licensed electrician. Verify against the current NEC and your AHJ.\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Use this calculator to check whether a group of conductors fits in a conduit. It is meant for estimators who need a fast check while sizing raceway. It does not replace the code or the installing electrician's judgment.\u003C\u002Fp>\n",{"id":18,"title":19,"kind":20,"html":21},"how-to-use-it","How to use it","body","\u003Ch2 id=\"how-to-use-it\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">How to use it\u003C\u002Fh2>\n\u003Col class=\"my-5 ml-6 list-decimal space-y-2.5 text-lg text-slate-800 marker:font-extrabold marker:text-accent-dark sm:text-xl\">\n\u003Cli class=\"pl-2\">Choose the conduit type and trade size.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">For each conductor size, enter how many conductors you are pulling. The calculator looks up the area of each conductor, including insulation, for the insulation type you choose.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Read the result: total conductor area, the allowed fill for that count of conductors, the percent fill, and whether the check passes.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">If the check fails, try the next larger trade size, split the conductors into two raceways, or change the conductor type.\u003C\u002Fli>\n\u003C\u002Fol>\n",{"id":23,"title":24,"kind":20,"html":25},"what-conduit-fill-means","What conduit fill means","\u003Ch2 id=\"what-conduit-fill-means\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">What conduit fill means\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Conduit fill is the share of a conduit's inside cross-section that conductors take up. The limit exists so that wires can be pulled without damage and so that heat can leave the bundle. Conductors in a crowded conduit run warmer, which is why a high conductor count also lowers allowable current.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The NEC sets the maximum fill by number of conductors. It is in Chapter 9, in the notes and tables for conduit and tubing, and the limits are in words:\u003C\u002Fp>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">One conductor:\u003C\u002Fstrong> a little over half of the conduit's inside area may be filled.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Two conductors:\u003C\u002Fstrong> a little under a third.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">More than two conductors:\u003C\u002Fstrong> about four tenths.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The reason for the two-conductor limit is jamming: two wires of nearly the same size can wedge against the wall of the conduit during a pull. The percentages are in Chapter 9, Table 1. The calculator uses conductor areas (including insulation) from NFPA 70 (NEC) Chapter 9, Table 5, and conduit internal areas from Table 4, built in for THHN\u002FTHWN-2 and XHHW\u002FXHHW-2 conductors and common conduit types. The dimensional values come from the 2011 edition of those tables. A secondary source reports that the 2023 edition did not change them for standard conduit and for THHN, THWN-2 and XHHW-2 conductors (see Sources), but we could not check that against the NFPA text. The site does not publish the tables themselves. Check your project against your own copy of the NEC edition your jurisdiction has adopted.\u003C\u002Fp>\n",{"id":27,"title":28,"kind":20,"html":29},"the-calculation-in-plain-steps","The calculation in plain steps","\u003Ch2 id=\"the-calculation-in-plain-steps\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">The calculation in plain steps\u003C\u002Fh2>\n\u003Col class=\"my-5 ml-6 list-decimal space-y-2.5 text-lg text-slate-800 marker:font-extrabold marker:text-accent-dark sm:text-xl\">\n\u003Cli class=\"pl-2\">Add up the area of every conductor, including insulation.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Look up the conduit's internal area for the type and trade size.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Divide the total conductor area by the conduit area. That is the percent fill.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Compare it with the limit for your conductor count. A percent fill at or under the limit passes.\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">You can also work backward: divide the total conductor area by the limit to find the smallest internal area that works, then choose the smallest trade size at or above it.\u003C\u002Fp>\n",{"id":31,"title":32,"kind":20,"html":33},"worked-examples","Worked examples","\u003Ch2 id=\"worked-examples\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Worked examples\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The numbers below are made up to show the steps. They are not code values. Use the areas from your own tables.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Example A, more than two conductors.\u003C\u002Fstrong> Six conductors with a total area of 0.30 square inches go in a conduit with an internal area of 1.00 square inch. Percent fill is 30%. The limit for more than two conductors is about 40%, so it passes. The smallest conduit area that would work is 0.30 divided by 0.40, or 0.75 square inch.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Example B, two conductors.\u003C\u002Fstrong> Two conductors with a total area of 0.40 square inches go in the same 1.00 square inch conduit. Percent fill is 40%. The limit for two conductors is about 31%, so it fails even though the same 40% passed for a larger group. A bigger conduit is needed: 0.40 divided by 0.31 is about 1.29 square inches.\u003C\u002Fp>\n",{"id":35,"title":36,"kind":20,"html":37},"limits-of-this-calculator","Limits of this calculator","\u003Ch2 id=\"limits-of-this-calculator\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Limits of this calculator\u003C\u002Fh2>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">It checks fill only. It does not check ampacity, derating for more than three current-carrying conductors, ambient temperature, voltage drop or bending.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">It does not know your local amendments. The authority having jurisdiction, or AHJ, can require more than the code does.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">It does not cover short nipples or special cable assemblies, which have their own entries in the code.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Fill is not the only reason a pull fails. Long runs, many bends and tight spaces make a pull hard even when the number is within the limit. Long runs also need a \u003Ca href=\"\u002Fvoltage-drop-calculator\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">voltage drop calculator\u003C\u002Fa> check.\u003C\u002Fli>\n\u003C\u002Ful>\n",{"id":39,"title":40,"kind":20,"html":41},"related-pages","Related pages","\u003Ch2 id=\"related-pages\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Related pages\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Enter raceway cost in the \u003Ca href=\"\u002Felectrical-estimate-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical estimate template\u003C\u002Fa>. To find the conduit runs on a drawing set, see \u003Ca href=\"\u002Felectrical-blueprint-symbols\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical blueprint symbols\u003C\u002Fa> and \u003Ca href=\"\u002Fhow-to-read-electrical-blueprints\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">how to read electrical blueprints\u003C\u002Fa>. To count every device on the set, see \u003Ca href=\"\u002Felectrical-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical takeoff software\u003C\u002Fa>.\u003C\u002Fp>\n",{"id":43,"title":44,"kind":43,"html":45,"faq":46},"faq","FAQ","\u003Ch2 id=\"faq\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">FAQ\u003C\u002Fh2>\n",[47,50,53],{"question":48,"html":49},"Do I need to include the ground wire?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Equipment grounding conductors count toward fill when they are in the conduit. Check the code and include them in the total area.\u003C\u002Fp>\n",{"question":51,"html":52},"Why is two conductors a lower limit than three?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Two similar wires can jam against the conduit wall in a pull. The code uses a lower fill limit for two conductors to leave room.\u003C\u002Fp>\n",{"question":54,"html":55},"Can I use this for cable tray or wireway?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">No. Those have their own rules in the code. This tool is for conduit and tubing fill only.\u003C\u002Fp>\n",{"id":57,"title":58,"kind":57,"html":59},"sources","Sources","\u003Ch2 id=\"sources\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Sources\u003C\u002Fh2>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">NFPA 70, National Electrical Code (NEC), Chapter 9, Table 1 (fill percentages), Table 4 (conduit and tubing dimensions) and Table 5 (conductor dimensions). Values in this calculator follow the 2011 edition. NFPA publishes the code at nfpa.org.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">&quot;NEC 2023 conduit updates&quot;, conduitfillcalculator.pages.dev (a third-party blog, not NFPA): reports no substantive change to Tables 4 and 5 for standard conduit and for THHN, THWN-2 and XHHW-2 in the 2023 edition. \u003Ca href=\"https:\u002F\u002Fconduitfillcalculator.pages.dev\u002Fblog\u002Fnec-2023-conduit-updates\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\" rel=\"noopener\">https:\u002F\u002Fconduitfillcalculator.pages.dev\u002Fblog\u002Fnec-2023-conduit-updates\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Wikipedia, &quot;Electrical conduit&quot;: many conductors in one conduit shed heat poorly, so allowable current is reduced.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The calculator has not been reviewed by a licensed electrician. Your adopted NEC edition and local amendments govern.\u003C\u002Fp>\n",[61,62,63,64,65,66,67,68],{"id":18,"title":19},{"id":23,"title":24},{"id":27,"title":28},{"id":31,"title":32},{"id":35,"title":36},{"id":39,"title":40},{"id":43,"title":44},{"id":57,"title":58},[],4,[72,76,81,86],{"path":73,"h1":74,"description":75,"kind":8},"\u002Fvoltage-drop-calculator","Voltage drop calculator","Free voltage drop calculator for single-phase and three-phase circuits. Enter current, length and wire resistance per 1000 ft to see volts and percent drop.",{"path":77,"h1":78,"description":79,"kind":80},"\u002Felectrical-estimate-template","Electrical estimate template (Excel and PDF)","Free electrical estimate template in Excel and PDF with a device takeoff table, labor rate, overhead and markup, totals by formula, and exclusions.","template",{"path":82,"h1":83,"description":84,"kind":85},"\u002Felectrical-blueprint-symbols","Electrical blueprint symbols on construction plans","Plain-words guide to the symbols on commercial electrical plans: receptacles, switches, S3 and (a,b,c) groups, fixtures, panels, home runs and circuit tags.","guide",{"path":87,"h1":88,"description":89,"kind":85},"\u002Fhow-to-read-electrical-blueprints","How to read electrical blueprints","How to read commercial electrical blueprints: sheet index, legend, notes, panel schedules, one-line diagram, plans, demolition, new vs existing, load checks.",[],null]