[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:\u002Felectrical-bid-software":3},{"path":4,"title":5,"description":6,"h1":7,"kind":8,"updated":9,"calculator":10,"downloads":11,"sections":12,"toc":48,"stats":54,"readingMinutes":55,"related":56,"children":75,"parent":10},"\u002Felectrical-bid-software","Electrical Bid Software: Proposal PDF and RFI Letters","Build the bid package from your takeoff: a client proposal PDF with inclusions, exclusions and qualifications, RFI letters from open items, and an example exclusions list.","Electrical bid software for the proposal and the questions you send","product","2026-11-15",null,[],[13,17,22,26,30,34],{"id":14,"title":15,"kind":14,"html":16},"intro","","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">A bid is more than a number. The client reads the proposal, and the proposal says what the number covers. Electrical Estimating Pro builds the bid package from your takeoff: a client proposal PDF and a set of RFI letters, both from the Documents tab. The price in the proposal comes from the Bid tab, where you set the unit prices (see \u003Ca href=\"\u002Felectrical-estimating-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical estimating software\u003C\u002Fa>). The counting itself is on the \u003Ca href=\"\u002Felectrical-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical takeoff software\u003C\u002Fa> page. You review everything before it leaves your office.\u003C\u002Fp>\n",{"id":18,"title":19,"kind":20,"html":21},"the-proposal-pdf","The proposal PDF","body","\u003Ch2 id=\"the-proposal-pdf\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">The proposal PDF\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The proposal has your company details, the project, the base bid and these parts:\u003C\u002Fp>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Inclusions.\u003C\u002Fstrong> What the price covers.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Exclusions.\u003C\u002Fstrong> What it does not cover.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Qualifications.\u003C\u002Fstrong> The conditions and assumptions the price depends on, and how long the proposal is valid.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Price breakdown.\u003C\u002Fstrong> The base bid by CSI section. The unit prices in the breakdown are editable, and the tool marks which sections you edited. You can switch the breakdown off, and round the bid to the nearest $100.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Acceptance block.\u003C\u002Fstrong> Signature lines for both companies.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The inclusions, exclusions and qualifications start from a default text that you edit line by line. Your company details are saved in your browser only. Empty fields show a placeholder, so a missing detail is easy to see before you send the file. The default text is a starting point, not legal advice. Have your own terms checked.\u003C\u002Fp>\n",{"id":23,"title":24,"kind":20,"html":25},"open-items-become-exclusions-and-rfis","Open items become exclusions and RFIs","\u003Ch2 id=\"open-items-become-exclusions-and-rfis\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Open items become exclusions and RFIs\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The takeoff lists open items: questions, quotes you need, assumptions and scope points. Each one can go two ways. If you can price it with a stated assumption, it belongs in the proposal as a clarification or an exclusion. If it changes the price enough that you need the answer, it becomes an RFI letter.\u003C\u002Fp>\n\u003Ch3 id=\"an-example-clarifications-and-exclusions-list\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">An Example clarifications and exclusions list\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">This is an Example of how open items from a set like the office renovation sample could read in a proposal. The wording is ours and you would change it to fit your bid.\u003C\u002Fp>\n\u003Cdiv class=\"my-8 overflow-x-auto rounded-2xl border border-mint-200 bg-white shadow-sm\">\u003Ctable class=\"w-full min-w-[32rem] border-collapse text-left text-base tabular-nums sm:text-lg\">\n\u003Cthead class=\"bg-mint-200\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Open item\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">How it reads in the proposal\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody class=\"divide-y divide-slate-100\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">The emergency lighting circuit has no panel schedule in the set.\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">Clarification: emergency circuit loads are not verified against a panel schedule, because none is provided.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">A ceiling fire alarm symbol is not described in the legend.\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">Exclusion: fire alarm devices are furnished, installed and programmed by others. Conduit and boxes only if shown.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Receptacles and data outlets are tagged as part of the furniture.\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">Exclusion: furniture-fed devices and their connections are by the furniture vendor.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">A note lets the contractor determine the number of occupancy sensors.\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">Qualification: priced for the 37 sensor symbols shown. Any further sensors are added at unit price.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\u003C\u002Fdiv>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The last row uses the number from the \u003Ca href=\"\u002Fsample-takeoffs\u002Foffice-renovation\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">office renovation sample\u003C\u002Fa>.\u003C\u002Fp>\n",{"id":27,"title":28,"kind":20,"html":29},"rfi-letters","RFI letters","\u003Ch2 id=\"rfi-letters\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">RFI letters\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The RFI letters come from the same open items. You enter the recipient, the attention line, the project name and the location. Then one letter is written per open question, with a number and a subject you can edit. Questions about quotes and scope are optional extras you tick on. Each letter can be switched off before the PDF is made.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Not every open item needs a letter. Write one question per RFI, name the sheet, say how you priced it until you get an answer, and give a due date. The \u003Ca href=\"\u002Fconstruction-rfi-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">construction RFI template\u003C\u002Fa> has the fields and examples, and \u003Ca href=\"\u002Fhow-to-bid-electrical-jobs\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">how to bid electrical jobs\u003C\u002Fa> covers the wider process.\u003C\u002Fp>\n",{"id":31,"title":32,"kind":20,"html":33},"who-does-what","Who does what","\u003Ch2 id=\"who-does-what\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Who does what\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The tool drafts the documents. You decide what is included and excluded, what to ask, what the price is and whether to submit. A bid that goes out with an exclusion you did not read is your bid. The takeoff is a first pass, and so are these documents.\u003C\u002Fp>\n",{"id":35,"title":36,"kind":35,"html":37,"faq":38},"faq","FAQ","\u003Ch2 id=\"faq\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">FAQ\u003C\u002Fh2>\n",[39,42,45],{"question":40,"html":41},"Does it send the documents for me?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">No. It makes PDFs that you download and send yourself.\u003C\u002Fp>\n",{"question":43,"html":44},"What if an addendum changes the drawings?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Upload the new set as a new project and compare it with the earlier count. See \u003Ca href=\"\u002Fpricing\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">pricing\u003C\u002Fa> for what counts as one project.\u003C\u002Fp>\n",{"question":46,"html":47},"Can I see how the count was tested first?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Yes. The \u003Ca href=\"\u002Fsample-takeoffs\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">sample takeoffs\u003C\u002Fa> show real public bid sets, and \u003Ca href=\"\u002Fai-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">AI takeoff software\u003C\u002Fa> explains the misses.\u003C\u002Fp>\n",[49,50,51,52,53],{"id":18,"title":19},{"id":23,"title":24},{"id":27,"title":28},{"id":31,"title":32},{"id":35,"title":36},[],3,[57,61,65,70],{"path":58,"h1":59,"description":60,"kind":8},"\u002Felectrical-estimating-software","Electrical estimating software: from the device count to a bid total","Walk an example from a counted drawing set through assemblies, labor rate, overhead and markup to a bid total, with wire and conduit priced per foot.",{"path":62,"h1":63,"description":64,"kind":8},"\u002Felectrical-takeoff-software","Electrical takeoff software: what you get from a PDF drawing set","What the takeoff gives you from a PDF electrical drawing set: counted devices by sheet, a mark on the drawing for each one, open items and a CSV with named columns.",{"path":66,"h1":67,"description":68,"kind":69},"\u002Fsample-takeoffs\u002Foffice-renovation","Sample takeoff: office renovation, 7 sheets","Example takeoff from a public bid set: a 7-sheet office renovation. 555 new devices by group, lighting by type, plus existing, relocated and demolition.","sample",{"path":71,"h1":72,"description":73,"kind":74},"\u002Fconstruction-rfi-template","Construction RFI template (Word, Excel, PDF) with electrical examples","Free construction RFI template in Word, with an Excel RFI log and a PDF. Includes 16 electrical RFI examples with ready wording, and tips for getting an answer.","template",[]]