[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:\u002Felectrical-estimating-software":3},{"path":4,"title":5,"description":6,"h1":7,"kind":8,"updated":9,"calculator":10,"downloads":11,"sections":12,"toc":55,"stats":62,"readingMinutes":63,"related":64,"children":82,"parent":10},"\u002Felectrical-estimating-software","Electrical Estimating Software: From Device Count to Bid Total","Walk an example from a counted drawing set through assemblies, labor rate, overhead and markup to a bid total, with wire and conduit priced per foot.","Electrical estimating software: from the device count to a bid total","product","2026-11-15",null,[],[13,17,22,26,30,34,38],{"id":14,"title":15,"kind":14,"html":16},"intro","","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Electrical estimating software turns quantities into a price. Electrical Estimating Pro starts from your PDF drawings: an AI counts the devices, estimates wire and conduit lengths from the plans, and the Bid tab prices them with unit prices and labor times that you edit. The prices it starts with are examples, not quotes. You replace them with your own numbers or supplier prices before you use a total. The output of the count is described on the \u003Ca href=\"\u002Felectrical-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical takeoff software\u003C\u002Fa> page.\u003C\u002Fp>\n",{"id":18,"title":19,"kind":20,"html":21},"how-the-bid-tab-is-built","How the Bid tab is built","body","\u003Ch2 id=\"how-the-bid-tab-is-built\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">How the Bid tab is built\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The Bid tab groups the priced lines by CSI section: 26 05 19 conductors and cables, 26 05 33 raceways and boxes, 26 27 26 wiring devices, 26 51 00 interior lighting, and so on. Each counted line is matched to an assembly. An assembly is a material cost per unit plus a labor time per unit. You can switch the assembly of any line, and you can overwrite its material price and labor time. You also set four numbers for the whole bid: the labor rate, sales tax on material, overhead and profit (markup).\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Only new and relocated devices are priced. Relocated devices are labor only. Existing and demolished lines are left out of the price and the tab says how many.\u003C\u002Fp>\n",{"id":23,"title":24,"kind":20,"html":25},"an-example-step-by-step","An Example, step by step","\u003Ch2 id=\"an-example-step-by-step\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">An Example, step by step\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Everything below is an Example with made-up numbers. It is not a quote and not from one of our sample sets.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Settings: labor rate $50 per hour, overhead 12%, markup 8%. Sales tax on material is set to 0% here to keep the arithmetic short. The Bid tab has a field for it.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">For every line: line price = qty x (material each + labor minutes each \u002F 60 x labor rate).\u003C\u002Fp>\n\u003Cdiv class=\"my-8 overflow-x-auto rounded-2xl border border-mint-200 bg-white shadow-sm\">\u003Ctable class=\"w-full min-w-[32rem] border-collapse text-left text-base tabular-nums sm:text-lg\">\n\u003Cthead class=\"bg-mint-200\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Line\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Qty\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Material each\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Labor each\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Labor cost each\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Line price\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody class=\"divide-y divide-slate-100\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Duplex receptacle, box, plate\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">40\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$12.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">24 min\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$20.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$1,280.00\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Troffer light, fixture supplied\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">20\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$95.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">60 min\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$50.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$2,900.00\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Single-pole switch, box, plate\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">10\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$12.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">24 min\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$20.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$320.00\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">MC cable 12\u002F2, per ft\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">1,800 ft\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$0.85\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">0.72 min\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$0.60\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$2,610.00\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">EMT conduit 3\u002F4 in, per ft\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">150 ft\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$1.60\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">2.4 min\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$2.00\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">$540.00\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">\u003Cstrong class=\"font-bold text-slate-900\">Subtotal (direct cost)\u003C\u002Fstrong>\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">\u003Cstrong class=\"font-bold text-slate-900\">$7,650.00\u003C\u002Fstrong>\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\u003C\u002Fdiv>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The first three lines are device counts. The last two are wire and conduit lines, priced per foot from lengths estimated on the Wiring tab. The same rule applies to both: a device is priced per piece, a cable or conduit per foot.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Then the totals:\u003C\u002Fp>\n\u003Col class=\"my-5 ml-6 list-decimal space-y-2.5 text-lg text-slate-800 marker:font-extrabold marker:text-accent-dark sm:text-xl\">\n\u003Cli class=\"pl-2\">Overhead, 12% of the subtotal: $7,650.00 x 0.12 = $918.00.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Subtotal plus overhead: $7,650.00 + $918.00 = $8,568.00.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Markup, 8% of that: $8,568.00 x 0.08 = $685.44.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Total: $8,568.00 + $685.44 = $9,253.44, which is the same as ($7,650.00 + $918.00) x 1.08.\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">In the tool, sales tax is added to the material of each line before overhead, so a nonzero tax rate raises the subtotal. Change any rate, price or time and every total updates.\u003C\u002Fp>\n",{"id":27,"title":28,"kind":20,"html":29},"wire-and-conduit","Wire and conduit","\u003Ch2 id=\"wire-and-conduit\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Wire and conduit\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The Wiring tab estimates branch-circuit wire and conduit lengths from the device positions, the drawn scale, the panel position and the circuit tags. Runs go rectilinear from the panel, with drops and slack included. MC cable is the default, EMT is used for equipment and feeders, and the Bid tab has an &quot;EMT throughout&quot; option. Circuits are drawn on the plans so you can see what was measured.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">This is an estimate from the drawings, not a field measurement, and it has been tested on one sample set so far. Devices without a circuit tag on the plan are not measured. Check the lengths before you buy or bid.\u003C\u002Fp>\n",{"id":31,"title":32,"kind":20,"html":33},"what-is-not-in-the-price","What is not in the price","\u003Ch2 id=\"what-is-not-in-the-price\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">What is not in the price\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The Bid tab lists what it leaves out: fixtures priced from a supplier quote, permits and job expenses. The open items from the takeoff show what else may change the price: quotes you need, assumptions made and scope to confirm. A count that ignores unclear drawings can be wrong in a way no software shows, so read them before you submit. The proposal and RFI letters built from them are on the \u003Ca href=\"\u002Felectrical-bid-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical bid software\u003C\u002Fa> page.\u003C\u002Fp>\n",{"id":35,"title":36,"kind":20,"html":37},"check-it-on-a-real-set-first","Check it on a real set first","\u003Ch2 id=\"check-it-on-a-real-set-first\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Check it on a real set first\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The \u003Ca href=\"\u002Fsample-takeoffs\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">sample takeoffs\u003C\u002Fa> show the counts and open items on real public drawing sets. The \u003Ca href=\"\u002Fai-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">AI takeoff software\u003C\u002Fa> page covers where the count failed in our tests. If you prefer your own sheet, the \u003Ca href=\"\u002Felectrical-estimate-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical estimate template\u003C\u002Fa> is a place to start, and the \u003Ca href=\"\u002Felectrical-panel-schedule-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">panel schedule template\u003C\u002Fa> helps with the load cross-check.\u003C\u002Fp>\n",{"id":39,"title":40,"kind":39,"html":41,"faq":42},"faq","FAQ","\u003Ch2 id=\"faq\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">FAQ\u003C\u002Fh2>\n",[43,46,49,52],{"question":44,"html":45},"Are the prices in the Bid tab real?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">No. They are example unit prices and labor times. Replace them with your own prices or supplier quotes. The tab says so at the top.\u003C\u002Fp>\n",{"question":47,"html":48},"Can I use my own labor rate and markup?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Yes. The labor rate, sales tax, overhead and profit are fields you set, and the totals follow.\u003C\u002Fp>\n",{"question":50,"html":51},"What does it cost?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">See \u003Ca href=\"\u002Fpricing\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">pricing\u003C\u002Fa>.\u003C\u002Fp>\n",{"question":53,"html":54},"Who is it for?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Estimators and owners of small electrical contractors who bid commercial work from PDF drawings. It is not built for service calls or house wiring quotes.\u003C\u002Fp>\n",[56,57,58,59,60,61],{"id":18,"title":19},{"id":23,"title":24},{"id":27,"title":28},{"id":31,"title":32},{"id":35,"title":36},{"id":39,"title":40},[],4,[65,69,73,78],{"path":66,"h1":67,"description":68,"kind":8},"\u002Felectrical-takeoff-software","Electrical takeoff software: what you get from a PDF drawing set","What the takeoff gives you from a PDF electrical drawing set: counted devices by sheet, a mark on the drawing for each one, open items and a CSV with named columns.",{"path":70,"h1":71,"description":72,"kind":8},"\u002Felectrical-bid-software","Electrical bid software for the proposal and the questions you send","Build the bid package from your takeoff: a client proposal PDF with inclusions, exclusions and qualifications, RFI letters from open items, and an example exclusions list.",{"path":74,"h1":75,"description":76,"kind":77},"\u002Fsample-takeoffs","Sample electrical takeoffs from public bid sets","Three example electrical takeoffs from public bid sets: a park restroom, an office renovation and a scanned music stage set. See how to read each takeoff.","hub",{"path":79,"h1":80,"description":81,"kind":8},"\u002Fai-takeoff-software","AI takeoff software: what it does well and where it fails","How AI counts electrical devices on PDF drawings, with results from our tests on three public bid sets, a real miss on grouped switches, and the fix we wrote.",[]]