[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:\u002Fsample-takeoffs":3},{"path":4,"title":5,"description":6,"h1":7,"kind":8,"updated":9,"calculator":10,"downloads":11,"sections":12,"toc":38,"stats":44,"readingMinutes":45,"related":46,"children":65,"parent":10},"\u002Fsample-takeoffs","Sample Electrical Takeoffs From Public Bid Sets","Three example electrical takeoffs from public bid sets: a park restroom, an office renovation and a scanned music stage set. See how to read each takeoff.","Sample electrical takeoffs from public bid sets","hub","2026-11-13",null,[],[13,17,22,26,30,34],{"id":14,"title":15,"kind":14,"html":16},"intro","","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Short answer:\u003C\u002Fstrong> these three pages show what a finished takeoff looks like, on real drawings from open public bids. Each one has tables, the open questions we found and the places where our count differs from another count. Every page opens with the label &quot;Example takeoff from a public bid set&quot;. We left out the names of the projects, owners and engineers.\u003C\u002Fp>\n",{"id":18,"title":19,"kind":20,"html":21},"the-three-samples","The three samples","body","\u003Ch2 id=\"the-three-samples\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">The three samples\u003C\u002Fh2>\n\u003Cdiv class=\"my-8 overflow-x-auto rounded-2xl border border-mint-200 bg-white shadow-sm\">\u003Ctable class=\"w-full min-w-[32rem] border-collapse text-left text-base tabular-nums sm:text-lg\">\n\u003Cthead class=\"bg-mint-200\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Sample\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Sheets\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Result\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">What it shows\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody class=\"divide-y divide-slate-100\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">\u003Ca href=\"\u002Fsample-takeoffs\u002Fpark-restroom\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">Park restroom\u003C\u002Fa>\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">3\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">82 devices on the plan sheet\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">A small, clean vector set. A full line table, a panel-load check and the RFIs.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">\u003Ca href=\"\u002Fsample-takeoffs\u002Foffice-renovation\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">Office renovation\u003C\u002Fa>\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">7\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">555 new devices\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">New, existing, relocated and demolished work. The group notation rule S3 (a,b,c).\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">\u003Ca href=\"\u002Fsample-takeoffs\u002Fmusic-stage-renovation\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">Music stage renovation\u003C\u002Fa>\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">6\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">55 new devices against 54\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">A scanned set with no text layer. One item that differs, and why.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\u003C\u002Fdiv>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">These are tests of our method, not customer work. We have no customers yet, and the numbers on these pages come from our own tests in November 2026. They do not prove the same result on your drawings.\u003C\u002Fp>\n",{"id":23,"title":24,"kind":20,"html":25},"which-model-ran-each-test","Which model ran each test","\u003Ch2 id=\"which-model-ran-each-test\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Which model ran each test\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The product's engine runs on Anthropic's Claude Sonnet. Claude Fable 5 is a larger Anthropic model than the Sonnet model the product runs on. Some earlier test runs used a larger Anthropic model, Claude Fable 5, without our written instructions. Each page names the model for each run, and the Sonnet runs are the ones that reflect the product.\u003C\u002Fp>\n",{"id":27,"title":28,"kind":20,"html":29},"how-to-read-a-takeoff","How to read a takeoff","\u003Ch2 id=\"how-to-read-a-takeoff\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">How to read a takeoff\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Every sample uses the same columns. Here is what each one means.\u003C\u002Fp>\n\u003Ch3 id=\"groups\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">Groups\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Devices are grouped by family so you can scan the list:\u003C\u002Fp>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Power:\u003C\u002Fstrong> receptacles, junction boxes, floor outlets.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Lighting:\u003C\u002Fstrong> luminaires, exit signs, emergency units.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Switches and controls:\u003C\u002Fstrong> switches, dimmers, sensors.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Data, fire alarm and access:\u003C\u002Fstrong> telecom outlets, alarm devices, card readers.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Panels and equipment:\u003C\u002Fstrong> panelboards, disconnects, equipment connections.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch3 id=\"status\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">Status\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Each line has one status:\u003C\u002Fp>\n\u003Cdiv class=\"my-8 overflow-x-auto rounded-2xl border border-mint-200 bg-white shadow-sm\">\u003Ctable class=\"w-full min-w-[32rem] border-collapse text-left text-base tabular-nums sm:text-lg\">\n\u003Cthead class=\"bg-mint-200\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Status\u003C\u002Fth>\n\u003Cth class=\"px-4 py-3.5 text-sm font-extrabold tracking-wider text-brand-950 uppercase\">Meaning\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody class=\"divide-y divide-slate-100\">\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">New\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">You supply and install it\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Existing\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">It stays; not in the new total\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Relocated\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">It is removed and reinstalled\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr class=\"even:bg-mint-50\">\n\u003Ctd class=\"px-4 py-3 align-top\">Demolished\u003C\u002Ftd>\n\u003Ctd class=\"px-4 py-3 align-top\">It comes out\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\u003C\u002Fdiv>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The new total holds only new work. Relocated and existing devices stay on their own lines. See \u003Ca href=\"\u002Fhow-to-read-electrical-blueprints\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">how to read electrical blueprints\u003C\u002Fa> for how notes change a status.\u003C\u002Fp>\n\u003Ch3 id=\"confidence\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">Confidence\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Confidence says how sure the count is: high, medium or low. A symbol that is clear and has a circuit and a schedule line is high. A symbol with no circuit, a note you must interpret, or a device that another party may supply is medium or low. Check those lines first.\u003C\u002Fp>\n\u003Ch3 id=\"rfis-open-questions\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">RFIs (open questions)\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">An RFI is a question to the design team. Each sample lists questions that came out of the drawings, such as a symbol the legend does not describe, a box with no circuit or a note that requires something the plan does not draw. Asking before the bid protects your price. Our guide on \u003Ca href=\"\u002Fhow-to-bid-electrical-jobs\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">how to bid electrical jobs\u003C\u002Fa> explains when to ask.\u003C\u002Fp>\n\u003Ch3 id=\"checks\" class=\"mt-10 mb-3 text-2xl font-bold text-brand-950 scroll-mt-28\">Checks\u003C\u002Fh3>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">A check compares the count with something else. The main one is the panel schedule: the loads of the devices on a circuit should add up to the circuit load. See the park restroom sample for a worked example.\u003C\u002Fp>\n",{"id":31,"title":32,"kind":20,"html":33},"what-to-look-for-in-each-sample","What to look for in each sample","\u003Ch2 id=\"what-to-look-for-in-each-sample\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">What to look for in each sample\u003C\u002Fh2>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Park restroom:\u003C\u002Fstrong> how the main device types matched a second count, and what the panel check looked like.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Office renovation:\u003C\u002Fstrong> how many statuses a remodel set has, and how one notation rule cost six switches in an earlier run.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">\u003Cstrong class=\"font-bold text-slate-900\">Music stage renovation:\u003C\u002Fstrong> how counting changes when the PDF has no text, and why one extra switch is marked medium confidence.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">To check the symbols on any of these sheets, see \u003Ca href=\"\u002Felectrical-blueprint-symbols\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical blueprint symbols\u003C\u002Fa>. To learn how software handles a whole set, see \u003Ca href=\"\u002Felectrical-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical takeoff software\u003C\u002Fa>. For how an AI count can go wrong, see \u003Ca href=\"\u002Fai-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">AI takeoff software\u003C\u002Fa>.\u003C\u002Fp>\n",{"id":35,"title":36,"kind":20,"html":37},"limits","Limits","\u003Ch2 id=\"limits\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Limits\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">None of the three counts proves accuracy on other drawings. The office set has no hand-verified reference. We have not settled the rights to show drawing excerpts, so these pages show tables and no images of the sheets.\u003C\u002Fp>\n",[39,40,41,42,43],{"id":18,"title":19},{"id":23,"title":24},{"id":27,"title":28},{"id":31,"title":32},{"id":35,"title":36},[],3,[47,52,56,60],{"path":48,"h1":49,"description":50,"kind":51},"\u002Fsample-takeoffs\u002Fpark-restroom","Sample takeoff: park restroom, 3 sheets, 82 devices","Example takeoff from a public bid set: a park restroom with 3 sheets. 82 devices on sheet E1.01, main device types checked by hand, a panel-load check and RFIs.","sample",{"path":53,"h1":54,"description":55,"kind":51},"\u002Fsample-takeoffs\u002Foffice-renovation","Sample takeoff: office renovation, 7 sheets","Example takeoff from a public bid set: a 7-sheet office renovation. 555 new devices by group, lighting by type, plus existing, relocated and demolition.",{"path":57,"h1":58,"description":59,"kind":51},"\u002Fsample-takeoffs\u002Fmusic-stage-renovation","Sample takeoff: music stage renovation, 6 sheets","Example takeoff from a public bid set: a scanned 6-sheet music stage renovation without a text layer. 55 new devices against 54 from a commercial service.",{"path":61,"h1":62,"description":63,"kind":64},"\u002Fhow-to-read-electrical-blueprints","How to read electrical blueprints","How to read commercial electrical blueprints: sheet index, legend, notes, panel schedules, one-line diagram, plans, demolition, new vs existing, load checks.","guide",[66,69,72],{"path":57,"title":67,"description":59,"h1":58,"kind":51,"updated":9,"calculator":10,"downloads":68},"Sample Takeoff: Music Stage Renovation, 6 Sheets, 55 Devices",[],{"path":53,"title":70,"description":55,"h1":54,"kind":51,"updated":9,"calculator":10,"downloads":71},"Sample Takeoff: Office Renovation, 7 Sheets, 555 Devices",[],{"path":48,"title":73,"description":50,"h1":49,"kind":51,"updated":9,"calculator":10,"downloads":74},"Sample Takeoff: Park Restroom, 3 Sheets, 82 Devices",[]]