[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:\u002Fvoltage-drop-calculator":3},{"path":4,"title":5,"description":6,"h1":7,"kind":8,"updated":9,"calculator":10,"downloads":11,"sections":12,"toc":64,"stats":74,"readingMinutes":75,"related":76,"children":95,"parent":96},"\u002Fvoltage-drop-calculator","Voltage Drop Calculator (Single and Three Phase)","Free voltage drop calculator for single-phase and three-phase circuits. Enter current, length and wire resistance per 1000 ft to see volts and percent drop.","Voltage drop calculator","calculator","2026-11-13","voltage-drop",[],[13,17,22,26,30,34,38,42,46,60],{"id":14,"title":15,"kind":14,"html":16},"intro","","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">This calculator has not yet been reviewed by a licensed electrician. Verify against the current NEC and your AHJ.\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Use this calculator to estimate the voltage lost along a conductor run. It is for estimators sizing feeders and long branch circuits while pricing a job. It is a screening tool: use it to see which runs need a closer look, and have the engineer or electrician confirm the final wire size.\u003C\u002Fp>\n",{"id":18,"title":19,"kind":20,"html":21},"how-to-use-it","How to use it","body","\u003Ch2 id=\"how-to-use-it\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">How to use it\u003C\u002Fh2>\n\u003Col class=\"my-5 ml-6 list-decimal space-y-2.5 text-lg text-slate-800 marker:font-extrabold marker:text-accent-dark sm:text-xl\">\n\u003Cli class=\"pl-2\">Pick single-phase or three-phase.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Enter the system voltage, for example 120, 208 or 240.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Enter the load current in amps.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Enter the one-way length of the run in feet.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Enter the conductor resistance per 1000 feet, in ohms. Take it from your own conductor table or the wire manufacturer's data. It depends on size, material (copper or aluminum) and temperature.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Read the result: volts dropped, percent of the system voltage, and the voltage at the load end.\u003C\u002Fli>\n\u003C\u002Fol>\n",{"id":23,"title":24,"kind":20,"html":25},"what-voltage-drop-is","What voltage drop is","\u003Ch2 id=\"what-voltage-drop-is\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">What voltage drop is\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Voltage drop is the loss of electrical potential as current flows through a conductor. It comes from the resistance of the wire, and in alternating-current systems also from reactance. It equals current times resistance (or impedance), and the wire's resistance rises with length and falls with a larger cross-section. It also depends on the metal and on temperature. (General background is in the Wikipedia article on voltage drop, listed below.)\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Too much drop means lights run dim, motors run hot and draw more current, and some equipment fails to start.\u003C\u002Fp>\n",{"id":27,"title":28,"kind":20,"html":29},"the-formula-in-words","The formula in words","\u003Ch2 id=\"the-formula-in-words\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">The formula in words\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Single-phase.\u003C\u002Fstrong> Multiply the current by the one-way length in feet, then by the resistance per 1000 feet, divide by 1000, and multiply by two. The two accounts for the current going out and coming back.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Three-phase.\u003C\u002Fstrong> Multiply the current by the one-way length, then by the resistance per 1000 feet, divide by 1000, and multiply by the square root of three, about 1.732. There is no extra factor of two because the phases carry each other's current.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Percent drop.\u003C\u002Fstrong> Divide the volts dropped by the system voltage and multiply by 100.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">This version uses resistance only. It ignores reactance, which matters for large conductors in steel conduit and for long runs at high current. It also ignores power factor and conductor temperature changes.\u003C\u002Fp>\n",{"id":31,"title":32,"kind":20,"html":33},"the-3-and-5-rule-of-thumb","The 3% and 5% rule of thumb","\u003Ch2 id=\"the-3-and-5-rule-of-thumb\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">The 3% and 5% rule of thumb\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">NFPA 70 (NEC) informational notes recommend keeping drop within about 3% on a branch circuit and about 5% on the combined feeder and branch circuit, measured to the farthest outlet. They are 210.19(A) Informational Note No. 4 (branch circuits) and 215.2(A)(1) Informational Note No. 2 (feeders). Those note numbers are as cited by trade sources for recent editions (2017 and 2020); we did not check them against the 2023 text, where numbering can shift, so confirm in your adopted edition. These are recommendations in informational notes, not requirements, in most cases. Project specifications, an engineer, or your local authority can set tighter limits. Treat 3% and 5% as a starting point and not a pass-or-fail rule.\u003C\u002Fp>\n",{"id":35,"title":36,"kind":20,"html":37},"worked-examples","Worked examples","\u003Ch2 id=\"worked-examples\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Worked examples\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The resistance values below are illustrative, not code values. Use values from your own tables.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Example A, single-phase.\u003C\u002Fstrong> A 120 V circuit carries 20 A over 100 feet one way. Resistance is taken as 1.24 ohms per 1000 feet. Drop is 2 × 100 × 20 × 1.24 ÷ 1000, which is 4.96 volts. As a percent of 120 V, that is about 4.1%, above the 3% guideline. A larger conductor with lower resistance would bring it down. At 0.78 ohms per 1000 feet the drop is 3.12 volts, about 2.6%.\u003C\u002Fp>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">\u003Cstrong class=\"font-bold text-slate-900\">Example B, three-phase.\u003C\u002Fstrong> A 208 V three-phase feeder carries 30 A over 150 feet. Resistance is taken as 0.49 ohms per 1000 feet. Drop is 1.732 × 150 × 30 × 0.49 ÷ 1000, which is about 3.8 volts, or 1.8% of 208 V.\u003C\u002Fp>\n",{"id":39,"title":40,"kind":20,"html":41},"limits-of-this-calculator","Limits of this calculator","\u003Ch2 id=\"limits-of-this-calculator\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Limits of this calculator\u003C\u002Fh2>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">It does not choose wire size, check ampacity or apply derating.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">It ignores reactance and power factor, so results are slightly low for large conductors.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">It assumes balanced three-phase loads.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">It uses the resistance you type. A wrong table value gives a wrong answer.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Drop is a performance issue, not a safety limit by itself. Safety limits come from ampacity and protection rules.\u003C\u002Fli>\n\u003C\u002Ful>\n",{"id":43,"title":44,"kind":20,"html":45},"related-pages","Related pages","\u003Ch2 id=\"related-pages\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Related pages\u003C\u002Fh2>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Add feeder costs to the \u003Ca href=\"\u002Felectrical-estimate-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical estimate template\u003C\u002Fa>. Check conduit size with the \u003Ca href=\"\u002Fconduit-fill-calculator\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">conduit fill calculator\u003C\u002Fa>. Panel loads are in the \u003Ca href=\"\u002Felectrical-panel-schedule-template\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">panel schedule template\u003C\u002Fa>. To read circuit tags and home runs on a drawing, see \u003Ca href=\"\u002Felectrical-blueprint-symbols\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical blueprint symbols\u003C\u002Fa>. To count every device on the set, see \u003Ca href=\"\u002Felectrical-takeoff-software\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\">electrical takeoff software\u003C\u002Fa>.\u003C\u002Fp>\n",{"id":47,"title":48,"kind":47,"html":49,"faq":50},"faq","FAQ","\u003Ch2 id=\"faq\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">FAQ\u003C\u002Fh2>\n",[51,54,57],{"question":52,"html":53},"Is the length one-way or round trip?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Enter the one-way length. The formula includes the return path for single-phase.\u003C\u002Fp>\n",{"question":55,"html":56},"Why does my result differ from the engineer's?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">Engineers may use impedance instead of resistance, a specific temperature, or a real power factor. Their numbers will differ by a few percent on large conductors.\u003C\u002Fp>\n",{"question":58,"html":59},"Is 3% the code limit?","\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">No. It is a recommendation in an informational note. The limit that governs your job is in the specification or set by the local authority.\u003C\u002Fp>\n",{"id":61,"title":62,"kind":61,"html":63},"sources","Sources","\u003Ch2 id=\"sources\" class=\"mt-0 mb-6 text-3xl font-extrabold tracking-tight text-brand-950 scroll-mt-28 before:mb-4 before:block before:h-1.5 before:w-14 before:rounded-full before:bg-accent sm:text-4xl\">Sources\u003C\u002Fh2>\n\u003Cul class=\"my-5 ml-6 list-disc space-y-2.5 text-lg text-slate-800 marker:text-xl marker:text-accent sm:text-xl\">\n\u003Cli class=\"pl-2\">NFPA 70, National Electrical Code (NEC): 210.19(A) Informational Note No. 4 and 215.2(A)(1) Informational Note No. 2, the 3% and 5% recommendations. Numbering as cited in trade sources for recent editions; edition-specific numbering not checked against NFPA's text.\u003C\u002Fli>\n\u003Cli class=\"pl-2\">IAEI Magazine, &quot;Voltage Drop Formulas&quot;, lists these sections as the voltage drop references: \u003Ca href=\"https:\u002F\u002Fiaeimagazine.org\u002Felectrical-fundamentals\u002Fvoltage-drop-formulas\u002F\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\" rel=\"noopener\">https:\u002F\u002Fiaeimagazine.org\u002Felectrical-fundamentals\u002Fvoltage-drop-formulas\u002F\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli class=\"pl-2\">EC&amp;M, &quot;Voltage drop limitations, branch circuits&quot; (Code Quiz of the Day), quotes the 3% and 5% wording: \u003Ca href=\"https:\u002F\u002Fwww.ecmweb.com\u002Fcode-quiz-day\u002Fvoltage-drop-limitations-branch-circuits\" class=\"font-semibold text-brand-700 underline decoration-accent decoration-2 underline-offset-2 hover:text-accent-dark\" rel=\"noopener\">https:\u002F\u002Fwww.ecmweb.com\u002Fcode-quiz-day\u002Fvoltage-drop-limitations-branch-circuits\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli class=\"pl-2\">Wikipedia, &quot;Voltage drop&quot;: general definition and what resistance depends on.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp class=\"my-5 text-lg leading-relaxed text-slate-800 sm:text-xl sm:leading-relaxed\">The calculator has not been reviewed by a licensed electrician, and the examples above use illustrative resistance values.\u003C\u002Fp>\n",[65,66,67,68,69,70,71,72,73],{"id":18,"title":19},{"id":23,"title":24},{"id":27,"title":28},{"id":31,"title":32},{"id":35,"title":36},{"id":39,"title":40},{"id":43,"title":44},{"id":47,"title":48},{"id":61,"title":62},[],4,[77,82,86,90],{"path":78,"h1":79,"description":80,"kind":81},"\u002Felectrical-estimate-template","Electrical estimate template (Excel and PDF)","Free electrical estimate template in Excel and PDF with a device takeoff table, labor rate, overhead and markup, totals by formula, and exclusions.","template",{"path":83,"h1":84,"description":85,"kind":8},"\u002Fconduit-fill-calculator","Conduit fill calculator","Free conduit fill calculator for estimators. Add conductor areas, compare them with the allowed fill for 1, 2 or more conductors, and see how the check works.",{"path":87,"h1":88,"description":89,"kind":81},"\u002Felectrical-panel-schedule-template","Electrical panel schedule template (Excel and PDF)","Free panel schedule template in Excel and PDF. Single-phase 120\u002F240 V and three-phase 208Y\u002F120 V, 42 circuits, VA per phase and amps added by formulas.",{"path":91,"h1":92,"description":93,"kind":94},"\u002Felectrical-blueprint-symbols","Electrical blueprint symbols on construction plans","Plain-words guide to the symbols on commercial electrical plans: receptacles, switches, S3 and (a,b,c) groups, fixtures, panels, home runs and circuit tags.","guide",[],null]