Skip to content
Product Updated November 15, 2026 3 min read

Electrical bid software for the proposal and the questions you send

Build the bid package from your takeoff: a client proposal PDF with inclusions, exclusions and qualifications, RFI letters from open items, and an example exclusions list.

Bid package on a site-office table: a roll of drawings, a spec book and a manila envelope with a hard hat

A bid is more than a number. The client reads the proposal, and the proposal says what the number covers. Electrical Estimating Pro builds the bid package from your takeoff: a client proposal PDF and a set of RFI letters, both from the Documents tab. The price in the proposal comes from the Bid tab, where you set the unit prices (see electrical estimating software). The counting itself is on the electrical takeoff software page. You review everything before it leaves your office.

The proposal PDF

The proposal has your company details, the project, the base bid and these parts:

  • Inclusions. What the price covers.
  • Exclusions. What it does not cover.
  • Qualifications. The conditions and assumptions the price depends on, and how long the proposal is valid.
  • Price breakdown. The base bid by CSI section. The unit prices in the breakdown are editable, and the tool marks which sections you edited. You can switch the breakdown off, and round the bid to the nearest $100.
  • Acceptance block. Signature lines for both companies.

The inclusions, exclusions and qualifications start from a default text that you edit line by line. Your company details are saved in your browser only. Empty fields show a placeholder, so a missing detail is easy to see before you send the file. The default text is a starting point, not legal advice. Have your own terms checked.

Open items become exclusions and RFIs

The takeoff lists open items: questions, quotes you need, assumptions and scope points. Each one can go two ways. If you can price it with a stated assumption, it belongs in the proposal as a clarification or an exclusion. If it changes the price enough that you need the answer, it becomes an RFI letter.

An Example clarifications and exclusions list

This is an Example of how open items from a set like the office renovation sample could read in a proposal. The wording is ours and you would change it to fit your bid.

Open item How it reads in the proposal
The emergency lighting circuit has no panel schedule in the set. Clarification: emergency circuit loads are not verified against a panel schedule, because none is provided.
A ceiling fire alarm symbol is not described in the legend. Exclusion: fire alarm devices are furnished, installed and programmed by others. Conduit and boxes only if shown.
Receptacles and data outlets are tagged as part of the furniture. Exclusion: furniture-fed devices and their connections are by the furniture vendor.
A note lets the contractor determine the number of occupancy sensors. Qualification: priced for the 37 sensor symbols shown. Any further sensors are added at unit price.

The last row uses the number from the office renovation sample.

RFI letters

The RFI letters come from the same open items. You enter the recipient, the attention line, the project name and the location. Then one letter is written per open question, with a number and a subject you can edit. Questions about quotes and scope are optional extras you tick on. Each letter can be switched off before the PDF is made.

Not every open item needs a letter. Write one question per RFI, name the sheet, say how you priced it until you get an answer, and give a due date. The construction RFI template has the fields and examples, and how to bid electrical jobs covers the wider process.

Who does what

The tool drafts the documents. You decide what is included and excluded, what to ask, what the price is and whether to submit. A bid that goes out with an exclusion you did not read is your bid. The takeoff is a first pass, and so are these documents.

FAQ

Free to try on a sample

Upload your drawings

Send a PDF drawing set. The takeoff counts every electrical device by sheet, lists the open questions it found in the drawings, and emails you when it is ready. Export the result as CSV or JSON.

Early access: 1 free project up to 5 plan sheets. Paid plans start at $19.90 a month; cancel anytime.

  • Upload a PDF drawing set
  • Devices counted by sheet
  • Open questions listed for you
  • Export to CSV or JSON