How to bid electrical jobs

A plain commercial electrical bid process: read drawings and specs, do the takeoff, price labor and material, ask RFIs, write exclusions, add markup, bid day.

Electrical contractor and general contractor reviewing plans on a table in a jobsite trailer

Short answer: a good electrical bid is a count you can defend, prices you can explain and clear limits on what you included. Read the drawings and specs, count every device, price labor and material, ask your questions before the bid, write down what you excluded, add overhead and markup, and submit on time. This page covers commercial and light commercial jobs.

Summary

1. Read the drawings and the specs

Get every current sheet: electrical, architectural, mechanical and any other trade that touches your work. Sets can conflict, and revisions can change scope. Read the electrical specification sections and every addendum issued after the first release.

On the electrical sheets, read in this order: legend and notes, schedules, one-line diagram, then the plans. Our guide on how to read electrical blueprints walks through that order. Note what is new, what is existing and what is demolished. Only new work goes into the price.

2. Do the takeoff

A takeoff is the list of everything you must install. Start with devices: receptacles, switches, luminaires, panels, equipment connections, data, fire alarm. Count by type, by sheet and by status. Then measure conduit and wire.

Keep a few habits:

  • Use the legend, not memory, to name each symbol.
  • Keep notes about unclear symbols as you go. They become your RFIs.
  • Watch group notation such as S3 (a,b,c). One symbol can mean three switches. See electrical blueprint symbols.
  • Cross-check circuits against the panel schedule when you can.

A takeoff can be done by hand, in drawing software, by a service or with software. For how software does it, see electrical takeoff software. Whatever the method, you remain responsible for the bid, so check the count.

3. Price labor and material

Material is the quantity times the price of each item, plus the small parts that go with it: boxes, covers, connectors and supports. Many estimators price an assembly, such as "duplex receptacle with box, device, cover and whip", instead of single parts.

Labor is time. A labor unit is the time needed to install one item, usually in hours per item. Units depend on conditions: height, access, a hard ceiling, a tight schedule, crew skill. Start from a trusted table or your own history. Then adjust for the job in front of you.

Add what is easy to forget: lifts and rentals, permits, testing, cleanup, supervision and project management time. Get written quotes for luminaires, gear and anything with long lead times. Check that the quotes match the schedule on the drawings.

4. Ask RFIs before the bid

An RFI is a written question to the design team or the general contractor. Ask before you bid when an answer changes your price. Good questions are about:

  • a symbol the legend does not describe
  • a device with no circuit and no note
  • a requirement in a note that the plans do not draw, such as a time clock
  • a panel with no schedule
  • who supplies fire alarm devices, furniture power and fans
  • new, existing or relocated, when the plan does not say

Ask one question per RFI. Name the sheet and the location. Offer a suggested answer and say how you will price the item if no one replies. Short, specific questions get answers. Long, vague ones do not. Our test sets contained questions of every one of these kinds.

Keep every answer. If scope is disputed later, those answers support a change order.

5. Write exclusions and clarifications

Not every question gets an answer before the deadline. Write the rest into the bid.

  • Exclusions say what you did not price: for example, fire alarm devices by others, or temporary power.
  • Clarifications say how you read an unclear item: for example, "priced as GFCI at all receptacles within the stated distance of a sink."
  • Allowances and alternates cover items that are not fixed yet.

Be clear and short. A well-written list protects you after the award and tells the project manager where the edges are.

6. Overhead and markup

Direct costs are the material, labor, equipment and subcontractors for the job. Overhead covers costs that no single job pays for: rent, insurance, vehicles, office staff, software. You recover overhead and profit by adding a markup to the direct cost.

One industry glossary gives a typical markup range of 10 to 30 percent. The right number for you depends on your overhead, the risk on the job and how hungry the market is. Know your own overhead rate from your books. Remember that markup and margin are not the same percentage: a 25 percent markup is a 20 percent margin.

Example, with made-up rates. Not real prices or labor units. A small job: 24 receptacles, 10 switches and 18 2x2 troffers, a loaded labor rate of $72 per hour, 10% overhead and 20% markup. Line cost = qty × (material each + minutes ÷ 60 × rate).

  • Receptacle: $3.80 material, 20 minutes. Labor = 20 ÷ 60 × $72 = $24.00. Line = 24 × $27.80 = $667.20.
  • Switch: $6.50 material, 18 minutes. Labor = 18 ÷ 60 × $72 = $21.60. Line = 10 × $28.10 = $281.00.
  • Troffer: $62.00 material, 25 minutes. Labor = 25 ÷ 60 × $72 = $30.00. Line = 18 × $92.00 = $1,656.00.

Direct cost: $667.20 + $281.00 + $1,656.00 = $2,604.20. Overhead at 10%: $260.42, giving $2,864.62. With 20% markup: $2,864.62 × 1.20 = $3,437.54 (rounded).

Price per opening is the total divided by the device count, here $3,437.54 ÷ 52 = about $66.11. Use it only as a quick check against your own past jobs of the same kind. It ignores that a troffer costs far more than a switch, and it moves with wire length, ceiling type and access. Do not price a job by it.

7. Bid day

  • Re-read the bid form. Include every addendum number it asks for.
  • Check that the estimate scope matches the documents.
  • Check prices are current and that overhead and profit cover every line.
  • Check the exclusions and clarifications are in the bid.
  • Submit with time to spare. Late bids are usually thrown out.
  • After the bid, keep the estimate file. You will need it if you win, and it teaches you if you lose.

FAQ

References

Sources

Labor units and markup vary by region, union status and company, so this page gives no hours beyond the example. Public work often has bid forms and deadlines of its own; check the bid documents.

Free to try on a sample

Upload your drawings

Send a PDF drawing set. The takeoff counts every electrical device by sheet, lists the open questions it found in the drawings, and emails you when it is ready. Export the result as CSV or JSON.

Early access: 1 free project up to 5 plan sheets. Paid plans start at $19.90 a month; cancel anytime.

  • Upload a PDF drawing set
  • Devices counted by sheet
  • Open questions listed for you
  • Export to CSV or JSON