Sample electrical takeoffs from public bid sets

Three example electrical takeoffs from public bid sets: a park restroom, an office renovation and a scanned music stage set. See how to read each takeoff.

Stack of construction drawing sets with colored index tabs on a wooden table

Short answer: these three pages show what a finished takeoff looks like, on real drawings from open public bids. Each one has tables, the open questions we found and the places where our count differs from another count. Every page opens with the label "Example takeoff from a public bid set". We left out the names of the projects, owners and engineers.

The three samples

Sample Sheets Result What it shows
Park restroom 3 82 devices on the plan sheet A small, clean vector set. A full line table, a panel-load check and the RFIs.
Office renovation 7 555 new devices New, existing, relocated and demolished work. The group notation rule S3 (a,b,c).
Music stage renovation 6 55 new devices against 54 A scanned set with no text layer. One item that differs, and why.

These are tests of our method, not customer work. We have no customers yet, and the numbers on these pages come from our own tests in November 2026. They do not prove the same result on your drawings.

Which model ran each test

The product's engine runs on Anthropic's Claude Sonnet. Claude Fable 5 is a larger Anthropic model than the Sonnet model the product runs on. Some earlier test runs used a larger Anthropic model, Claude Fable 5, without our written instructions. Each page names the model for each run, and the Sonnet runs are the ones that reflect the product.

How to read a takeoff

Every sample uses the same columns. Here is what each one means.

Groups

Devices are grouped by family so you can scan the list:

  • Power: receptacles, junction boxes, floor outlets.
  • Lighting: luminaires, exit signs, emergency units.
  • Switches and controls: switches, dimmers, sensors.
  • Data, fire alarm and access: telecom outlets, alarm devices, card readers.
  • Panels and equipment: panelboards, disconnects, equipment connections.

Status

Each line has one status:

Status Meaning
New You supply and install it
Existing It stays; not in the new total
Relocated It is removed and reinstalled
Demolished It comes out

The new total holds only new work. Relocated and existing devices stay on their own lines. See how to read electrical blueprints for how notes change a status.

Confidence

Confidence says how sure the count is: high, medium or low. A symbol that is clear and has a circuit and a schedule line is high. A symbol with no circuit, a note you must interpret, or a device that another party may supply is medium or low. Check those lines first.

RFIs (open questions)

An RFI is a question to the design team. Each sample lists questions that came out of the drawings, such as a symbol the legend does not describe, a box with no circuit or a note that requires something the plan does not draw. Asking before the bid protects your price. Our guide on how to bid electrical jobs explains when to ask.

Checks

A check compares the count with something else. The main one is the panel schedule: the loads of the devices on a circuit should add up to the circuit load. See the park restroom sample for a worked example.

What to look for in each sample

  • Park restroom: how the main device types matched a second count, and what the panel check looked like.
  • Office renovation: how many statuses a remodel set has, and how one notation rule cost six switches in an earlier run.
  • Music stage renovation: how counting changes when the PDF has no text, and why one extra switch is marked medium confidence.

To check the symbols on any of these sheets, see electrical blueprint symbols. To learn how software handles a whole set, see electrical takeoff software. For how an AI count can go wrong, see AI takeoff software.

Limits

None of the three counts proves accuracy on other drawings. The office set has no hand-verified reference. We have not settled the rights to show drawing excerpts, so these pages show tables and no images of the sheets.

In this section

Free to try on a sample

Upload your drawings

Send a PDF drawing set. The takeoff counts every electrical device by sheet, lists the open questions it found in the drawings, and emails you when it is ready. Export the result as CSV or JSON.

Early access: 1 free project up to 5 plan sheets. Paid plans start at $19.90 a month; cancel anytime.

  • Upload a PDF drawing set
  • Devices counted by sheet
  • Open questions listed for you
  • Export to CSV or JSON