Short answer: read a commercial electrical set in a fixed order. Start with the sheet index, then the legend and notes, then the schedules and the one-line diagram. Read the plans last. Decide what is new, existing, relocated or demolished. After you count, check the count against the panel schedules.
This page is about building plans, not electronics schematics.
Summary
The sheet index
The first electrical sheet usually lists every sheet in the set with its number and title. Our test sets had between three and seven electrical sheets. A typical set has a legend and notes sheet, a one-line diagram, panel schedules, a luminaire schedule, one or more plans for power and lighting, and a demolition sheet.
Make your own list. Write the sheet number, the title and what role it plays. Mark the sheets where you will count. Plans that show new work are the counting sheets.
Legend, general notes and keyed notes
The legend shows what each symbol means in this set. Read it before the plans. See electrical blueprint symbols for a plain-words description of common ones.
General notes apply to the whole set. Keyed notes are numbered or lettered, and they appear on each plan with a small marker. Notes can change a device. For example, a general note may say that receptacles within 6 ft of a sink must be GFCI. You then scale the distance on the plan and apply the rule to every receptacle it covers, not only the first. In one of our tests, that note covered three receptacles, and one was an easy miss.
Notes can also require things that the plans do not draw, such as time clocks or motor disconnects.
Panel schedules
A panel schedule is a table for one panelboard. Each row is a circuit. It shows the breaker size, what the circuit serves and its load in volt-amperes. Panel schedules also tell you the voltage and phases of the panel.
Use them for two things:
- Names and sizes. Every circuit tag on the plans should appear in a schedule, and the other way round.
- Loads. The load of a circuit is the sum of what is on it.
A circuit tag such as 2B-15 is panel 2B, circuit 15.
The one-line diagram
The one-line diagram shows how power travels from the service to the panels. It shows feeders, breaker sizes, transformers and equipment ratings. You rarely count devices from it. You use it to find the panels, to see what feeds what and to spot problems. In one test, a lighting note said emergency lights were fed from an emergency power system, but the one-line diagram showed none. That was a question for the engineer.
Power plans and lighting plans
Power plans show receptacles, equipment connections, data outlets and often fire alarm and security. Lighting plans show luminaires, switches and controls.
Count each type on its own. Use the tag on the symbol. A luminaire tag such as A1 points to the luminaire schedule. A circuit tag points to a panel.
Count in small areas. Work through the sheet in overlapping pieces so nothing is counted twice or skipped. For each area, compare the number of symbols with the number of tags. They should agree.
Demolition sheets
Demolition sheets show what comes out, what stays and what is saved for reuse. Remodel sets often include them. They explain scope. They do not belong in the count of new devices. We list demolition as a rough summary and never mix it with new work.
Demolition notes also change the status of items on the new plans. A note may say that exit signs are removed, cleaned and reinstalled. Those are relocated, not new.
New, existing, relocated and demolished
Every device has one of four statuses:
| Status | Meaning |
|---|---|
| New | You supply and install it |
| Existing | It stays where it is |
| Relocated | It is removed and reinstalled |
| Demolished | It comes out |
Leaders and notes such as "existing to remain", "relocated" or "new device, existing outlet" set the status. A "new device, existing outlet" has a new device in an old box. Price it differently from a full new outlet.
Keep the four statuses in separate lines. Your new total should hold only new work.
Checking the count against panel loads
This is a method from our own takeoff process. For each circuit:
- Add up the load of the devices you counted. Use the luminaire schedule for fixtures and the equipment schedule for equipment. For receptacles, use the load basis the schedule uses.
- Compare the sum with the load on that circuit in the panel schedule.
- If they match, the count is probably right. If they do not, look for a missed device or a wrong type.
Here is an example from a three-sheet park restroom set. Circuit 1 serves 12 downlights at 12 VA each and 6 exhaust fans at 100 VA each. That is 144 plus 600, or 744 VA. The panel schedule shows 744 VA. The count was right. See the full sample.
Mismatches are useful too. In a larger office set, a few circuits did not match the panel schedule, and we turned those into questions. A mismatch is not always a missed device, because designers round loads. Treat it as a flag.
The check cannot prove a count. It only finds some errors. If a panel schedule shows zero load for lighting, as one of our scanned sets did, the check is not possible.
Where to go next
Once you can read the set, you can count it and price it. See how to bid electrical jobs for the steps after the takeoff, or electrical takeoff software for how software counts a set.
FAQ
The sheet index, then the legend and notes. Plans come after you know what the symbols and notes mean.
Check the legend, the keyed notes and the leaders on the plan. Words such as "existing to remain" and "relocated" change the status. Demolition sheets show what comes out.
The panel schedule lists the load on every circuit. If your counted devices add up to the same load, you probably did not miss anything on that circuit.
References
Sources
- No outside standard is quoted on this page. Symbols and abbreviations differ between designers, so the legend of your own set is the reference. See electrical blueprint symbols.
Panel loads are not always exact, because designers round and use different load bases, so a mismatch does not prove an error. Designers lay out sheets in different ways, and the "6 ft from a sink" example comes from the notes of one set. Your set may say something different, and code rules are not covered here.