Electrical takeoff software turns a drawing set into quantities: receptacles, lights, switches, fire alarm devices, panels. Electrical Estimating Pro does this from a PDF. You upload the set, and an AI follows a written counting method. You get the devices by sheet and group, a mark on the drawing for each device so you can check it, a list of open items, and a CSV or JSON export. It is in early access. This page describes the output in detail. For the tests and the failures, read AI takeoff software.
What gets counted
The takeoff reads the whole set, not only the power plan (the full method is on the AI takeoff software page). It counts devices on the new-work plans and sorts them into groups:
- Power
- Lighting
- Switches and controls
- Data, fire alarm and security
- Panels and equipment
Each line shows the item, the quantity, the sheet, a status and a confidence level. The status is new, existing, relocated or demolished. Only new devices go into the new-work totals. Existing devices that stay, and devices that are taken down and put back, get their own lines.
What you get back
This is the full list of what a finished project contains.
- Drawings tab. Your sheets, with a mark on the drawing for each counted device. You can open a sheet, click a mark and see the line behind it, so every mark can be checked.
- Quantities table. Counted lines grouped by device type, with the sheet, status and confidence. Totals by group and by sheet are added up by code, not by the AI, so they equal the sum of the lines.
- Open items. Questions the drawings leave open: RFIs, quotes you need, assumptions made and scope to confirm. Each has the reason and a suggested way to price it. A "noted, not counted" list covers items a note requires but the plans do not show.
- Cross-checks. Circuit loads compared with the panel schedule, and a short description of the method.
- Wiring tab. Branch-circuit wire and conduit lengths estimated from the plans. See electrical estimating software.
- Bid tab. The quantities priced with example unit prices that you edit. See electrical estimating software.
- Documents tab. A client proposal PDF and RFI letters as PDF. See electrical bid software.
- Exports. CSV and JSON of the counted lines, and a download of your original PDF.
An email arrives when the takeoff is ready.
The CSV export
The CSV has one row per counted line and ten columns, in this order:
| Column | Content |
|---|---|
| Group | One of the five groups above |
| Item | The device or fixture description |
| Symbol | The tag or symbol from the drawing, such as a fixture type letter |
| Qty | The counted quantity |
| Unit | The unit of the quantity |
| Status | new, existing, relocated or demolished |
| Confidence | high, medium or low |
| Sheet | The sheet where the line was found |
| Where | The room or area, when the drawing shows it |
| Note | A short note on the line, such as why confidence is low |
The file opens in Excel or Google Sheets. Text that starts with a character a spreadsheet could read as a formula is prefixed with an apostrophe, so it stays text. The JSON export holds the full result, not only the lines.
Example (made-up rows). The Where and Note text here is invented to show the format:
Group,Item,Symbol,Qty,Unit,Status,Confidence,Sheet,Where,Note
Lighting,Type C - 6in recessed LED downlight,C,12,ea,new,high,E1.01,Restrooms,
Power,"Duplex receptacle, GFCI",GFCI,3,ea,new,high,E1.01,Restrooms,Above counter
Switches & controls,Occupancy sensor switch,$OS,6,ea,new,high,E1.01,Restrooms,
File requirements
- One PDF, up to 100 MB. A file with an extreme page count is refused before any counting.
- Upload the whole drawing set, not only the electrical sheets. The notes, schedules and other trades' sheets help the AI understand the scope.
- A vector PDF exported from CAD gives the best results, because the text labels can be read directly. A scan with no text layer is harder, and the AI has to count by looking only.
- After upload, the file is checked and the sheets found are shown. Nothing is counted until you press Start counting. Files that are not electrical drawings are refused.
How to check the count
- Open the Drawings tab and spot-check one room or one area against the marks.
- Read the lines marked low or medium confidence first.
- Read the open items. A device with no circuit, note or schedule line is counted, marked low confidence and raised as a question.
- Compare the totals with the panel schedule. When circuit loads match the counted devices, that is a good sign. When they do not, something may be missed.
You stay the estimator. The count is a fast first pass that you review before you price.
Where it needs care
Heavy markups, hand sketches and very dense sheets deserve a closer look from you. The wire and conduit lengths are an estimate from the drawings, not a field measurement, and they have been tested on one sample set so far. Devices without a circuit tag on the plan are not measured.
See sample takeoffs for real output. If symbols are the part you want to understand first, start with electrical blueprint symbols, or read how to read electrical blueprints. A starting sheet for your own pricing is the electrical estimate template.
FAQ
One PDF of the whole drawing set, up to 100 MB. See the file requirements above.
It depends on the size of the set and how busy the queue is. In our tests, a 7-sheet office set and a 6-sheet scanned music stage set each took minutes, not hours. We send an email when yours is done.
No. Check it as you would check a helper's count. The marks on the drawings, the confidence levels, the open items and the cross-checks show you where to look first.