Electrical estimating software turns quantities into a price. Electrical Estimating Pro starts from your PDF drawings: an AI counts the devices, estimates wire and conduit lengths from the plans, and the Bid tab prices them with unit prices and labor times that you edit. The prices it starts with are examples, not quotes. You replace them with your own numbers or supplier prices before you use a total. The output of the count is described on the electrical takeoff software page.
How the Bid tab is built
The Bid tab groups the priced lines by CSI section: 26 05 19 conductors and cables, 26 05 33 raceways and boxes, 26 27 26 wiring devices, 26 51 00 interior lighting, and so on. Each counted line is matched to an assembly. An assembly is a material cost per unit plus a labor time per unit. You can switch the assembly of any line, and you can overwrite its material price and labor time. You also set four numbers for the whole bid: the labor rate, sales tax on material, overhead and profit (markup).
Only new and relocated devices are priced. Relocated devices are labor only. Existing and demolished lines are left out of the price and the tab says how many.
An Example, step by step
Everything below is an Example with made-up numbers. It is not a quote and not from one of our sample sets.
Settings: labor rate $50 per hour, overhead 12%, markup 8%. Sales tax on material is set to 0% here to keep the arithmetic short. The Bid tab has a field for it.
For every line: line price = qty x (material each + labor minutes each / 60 x labor rate).
| Line | Qty | Material each | Labor each | Labor cost each | Line price |
|---|---|---|---|---|---|
| Duplex receptacle, box, plate | 40 | $12.00 | 24 min | $20.00 | $1,280.00 |
| Troffer light, fixture supplied | 20 | $95.00 | 60 min | $50.00 | $2,900.00 |
| Single-pole switch, box, plate | 10 | $12.00 | 24 min | $20.00 | $320.00 |
| MC cable 12/2, per ft | 1,800 ft | $0.85 | 0.72 min | $0.60 | $2,610.00 |
| EMT conduit 3/4 in, per ft | 150 ft | $1.60 | 2.4 min | $2.00 | $540.00 |
| Subtotal (direct cost) | $7,650.00 |
The first three lines are device counts. The last two are wire and conduit lines, priced per foot from lengths estimated on the Wiring tab. The same rule applies to both: a device is priced per piece, a cable or conduit per foot.
Then the totals:
- Overhead, 12% of the subtotal: $7,650.00 x 0.12 = $918.00.
- Subtotal plus overhead: $7,650.00 + $918.00 = $8,568.00.
- Markup, 8% of that: $8,568.00 x 0.08 = $685.44.
- Total: $8,568.00 + $685.44 = $9,253.44, which is the same as ($7,650.00 + $918.00) x 1.08.
In the tool, sales tax is added to the material of each line before overhead, so a nonzero tax rate raises the subtotal. Change any rate, price or time and every total updates.
Wire and conduit
The Wiring tab estimates branch-circuit wire and conduit lengths from the device positions, the drawn scale, the panel position and the circuit tags. Runs go rectilinear from the panel, with drops and slack included. MC cable is the default, EMT is used for equipment and feeders, and the Bid tab has an "EMT throughout" option. Circuits are drawn on the plans so you can see what was measured.
This is an estimate from the drawings, not a field measurement, and it has been tested on one sample set so far. Devices without a circuit tag on the plan are not measured. Check the lengths before you buy or bid.
What is not in the price
The Bid tab lists what it leaves out: fixtures priced from a supplier quote, permits and job expenses. The open items from the takeoff show what else may change the price: quotes you need, assumptions made and scope to confirm. A count that ignores unclear drawings can be wrong in a way no software shows, so read them before you submit. The proposal and RFI letters built from them are on the electrical bid software page.
Check it on a real set first
The sample takeoffs show the counts and open items on real public drawing sets. The AI takeoff software page covers where the count failed in our tests. If you prefer your own sheet, the electrical estimate template is a place to start, and the panel schedule template helps with the load cross-check.
FAQ
No. They are example unit prices and labor times. Replace them with your own prices or supplier quotes. The tab says so at the top.
Yes. The labor rate, sales tax, overhead and profit are fields you set, and the totals follow.
See pricing.
Estimators and owners of small electrical contractors who bid commercial work from PDF drawings. It is not built for service calls or house wiring quotes.